The Bellary Facility II, located in Sidiginamola village, Bellary, Karnataka, is spread across 25.14 acres and has an installed capacity of 84,000 MTPA for GP Pipes, as of March 31, 2026. The facility operates as a downstream processing unit and is involved in processes including pickling and cold rolling, with annealing identified as a proposed process in the RHP. Its downstream product portfolio includes CR Coils, CR Pipes and GP Pipes. GP Pipe manufacturing involves pickling, annealing, continuous hot-dip galvanizing, coil slitting, roll forming, HF-ERW welding, sizing, straightening and cutting, followed by inspection and packing of finished pipes.